Chad A. Flood 418 AA
Meyers Rd, Sulphur, LA 70665 Home:
702-271-8257 • Cell: 702-271-8257 floodchad@gmail.com SUMMARY Highly Versatile Project
Manager/Project Controls Manager with more than Thirteen years working
in cross-functional environments in the U.S. and abroad. Exceptional written
and oral communication skills. Formal education and experience ranging from
United States Marine Corps, to hands-on industrial exposure at Sasol Mega
Project, lends me to any employer as a Project Manager/Project Controls
Manager/Maintenance Manager. I applied my knowledge of strategic analysis and
risk management. My work is organized to boost productivity through
innovative management and mentorship. I have extensive knowledge in
originating, implementing, and managing complex projects. I'm able
to derive at strategies for the method of executing work, such as developing
larger packages to be handled as projects where savings can be realized from
the use of value-improving practices. Evidence of my critical thinking was
the ability to raise production levels from a .38 to a 1.17 on a specific
performance (Firewater Pond) of the Mega Project. Other evidence is being
able to raise a combat readiness percentage from 40% to 95% in a timely
fashion between conflicts which resulted in a Presidential Unit Citation. I
strongly believe in the implementation of securing the right personnel to
obtain company goals and aspirations, while maintaining cost, augmenting
production levels, and pledging safety as a non-negotiable. HIGHLIGHTS Project development and life-cycleProject management Superb time management skillsOracle Primavera P6 8.3.2 Risk management
Strategic planning Management information systemsAnalytical Productivity improvement
Baseline schedules creation Contract management
Site safety coordinator Relationship buildingQuality management Global and strategic sourcingStaff leadership and
development Budgeting and forecastingEffective time manager Process improvementFinancial reporting Multi-unit operations management
Inventory management Cost control
Supply chain operations Project budgeting
Drafting techniques Power and hand tool operation
Technical drawing Safe job site set-up
Instructor Blueprint fluency ACCOMPLISHMENTS Steered multiple engagements in
support of $30 million in equipment and supplies domestically and abroad. From leading a
cross-functional team of 15 personnel for capital and turnarounds in multiple
operations essential required operations while deployed abroad. Also
contributed to an annual 79% increase in productivity through improvements in
operations while on a $14 billion dollar project while maintaining a 95%
success rate on assigned projects . Contributed to more than 1.5 million
man-hours safe. EXPERIENCE Project Management (10+
years),Project Controls Specialist (5 years),Planning Scheduling (10+years),
Operational Management (10+ years), Maintenance Repairs (8
years), Project Engineering (8 years), Accounting (8 years), Maintenance
Management (10+ years), Risk Management (10+ years), Microsoft Office (10+
years), Primavera P6 (3 years), Construction Management (8 years),
Maintenance Management Systems (10 years) Planner Scheduler II /Project
Engineer at Sasol Mega Project, 06/2015 to 02/2016 Primoris Service Company - Sulphur, LA As Planner Scheduler/Project Engineer to which I conducted
building the project schedule for Sasol Mega Project. I prepared medium and
long range plans to support efficient field results. Lead and develop Sasol
Mega Project strategy and the delivery of safe and effective project events. · Led
and developed Sasol Mega Project strategy and the delivery of safe and effective
project. · Built,
developed, and maintained a capable and efficient organization and work
processes, which provide a fit for purpose capital construction
support to meet site goals and objectives. · Functional
in a large projects which includes development of project control plans. · Ensured
required resources and effective processes are in place to execute the
project control plans. · Applied/followed
effective changes management processes to ensure capital discipline. · Led
forecasting/reporting of cost and schedule performance throughout project
life cycle. · Ensured
the appropriate level of project controls and if necessary financial controls
processes are in place to comply with the Delegation of Authority or Internal
Controls policies. · Assistance
with project team in resolution of issues involving cost, schedule, &
changes. · Ensured
that relevant cost management procedures and reporting requirements are incorporated where appropriate on contractor's scope of
services. · Reported
project cost to management as well as analyzing cost and schedule variances
and recommending corrective action. Junior Planner/Scheduler and
Multi-craft Lead Hand, 01/2013 to 05/2015 R & R Construction Inc. - Sulphur, LA During
my employment at R&R Construction Inc., I secured the knowledge of
Ironworking, Pipefitting, and Civil development, along with print reading on
the various projects. I built my industrial experience constructing the
following refineries: Westlake Petro Chemical, CITGO, Axial, PPG
(Silica), Conoco, Sasol. · Primavera
P6 Professional Certification (2014). · Lead
Hand- A-CAT turnaround of renovation of fireproofed concrete from unit
structure for installation of new materials, along with logistics of
equipment and materials. · Erected
structure and pipe for Acid Unit at Conoco turnaround. · Pipe-fitter:
Planned Scope of work for Waste Water Project at CITGO, while Fabricating
pipe and materials for installation insuring that perception of clients were
met through the manipulation of materials to meet engineered
specifications, along with tank fabrication and pipe-fit HDPE pipe for
underground firewater and storm-water. Planning/Scheduling/Project Engineer 2009-2012 Franks Casing and Rental Tools – Lafayette, LA Support
flawless execution of Projects for a global oilfield services company.
Dedicated to organizing and administering project activities under the
direction of the Project Manager, including (but not limited to): · Monitored
project activities against project schedule; liaise with work stream leads to
update plan in Microsoft Project weekly and contribute to weekly project
reporting. · Coordinated
project reporting and tracking including issue and decision logs, project
barriers and risks and other project status and issues that are monitored;
ensure issues are raised for timely resolution · Coordinated
key project activities and events to ensure appropriate global involvement
and in liaison between Frank’s and Workday. · Supported
project communication activities – key role in coordinating and scheduling
internal project team communication activities; support scheduling and
preparation for external communication activities with governance and
stakeholder groups. · Managed
project SharePoint site to support effective use by team and ongoing
organization/ maintenance of the site. Establish and support guidelines
for effective use of the site to ensure proper project documentation and use
of collaboration site. Supervisor of Lay-down Yard 1/2006 to 8/2006. Quality
Construction – Sulphur, LA Led
and training employees to become expeditors. As well as, maintaining
requisitions and reports for management and or client. Trained and instructed
personnel to be expeditors. Coordinated materials and equipment for
project needs and production essentials. Auditing, Budget tracking,
Inventory inspections of quantities of on hand and distributed equipment and
or materials, through verification of Isometrics, along with corresponding
with procurement management and foreman. Senior Maintenance Manager/Project
Manager, 10/2001 to 10/2008 United States Marine Corps - Camp Lejeune, NC Manage projects valued at over $30
million plus completed key projects on time, on budget and with a high level
of accuracy. Defined manufacturing performance standards and reviewed the
performance outcomes to set future targets. · Employ
the company's Project Management Process in execution of capital projects. · Lead
definition of project objectives, scope development, and front end
engineering in · support
of the project objectives. · Analyze
and manage risk on projects. · Lead
multi-discipline project management teams, including company and contract · personnel,
in resolution of technical and commercial issues. · Prepare
and implement project execution plans. · Develop
cost effective contracting strategies. · Accountable
for project cost and schedule controls, project reporting. · Obtain
funding for projects · Must
have excellent written and verbal communication skills, demonstrated problem · solving
and decision making skills. · Ability
to gather information and develop a thorough understanding of the project,
while · providing
strong leadership skills to lead a diverse cross-functional team is
essential. · Must
display strong personal initiative, a sound planning and problem solving
capacity, and · effective
interpersonal skills. · Routinely
prepare and present project updates to senior management. · Direct
company or contract project engineers in supporting roles on Major Projects. · Ability
to work independently with minimal supervision. · Abilities
to simultaneously manage multiple tasks and projects effectively. EDUCATION · Sowela
Technical Community College -
Lake Charles, LA, United States None: Drafting and Design
Technology · Oracle
University - Houston, TX,
United States Primavera P6 Professional
Rel.8.3.2, 2014 · Columbia
College - Columbia, MO, United States Bachelor of Science: Business
Management/Project Management, 2009 · Degree
Incomplete · Marine
Corps Maintenance Management -
Camp Lejeune, NC, United States · Marine
Corps Integrated Maintenance Management Certification, 2002 · Accounting
Certification- Financial Management, 2005 · Primavera
P6 Certification, 2014 · Leadership
Certification, 2002 · Single
Ground Airborne Radio Systems Certification, 2002 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|